KitLog pro

Powered By Kitlog Pro v2.0

My RV-8 build
' style=
Date:  6-6-2010
Number of Hours:  2.00
Manual Reference:  Page 6-8
Brief Description:  Counter weight work

Placed the E-714 counterweight on the forward end of the E-703 and E-704 as per the diagram. Clecoed the E-713 skin to the E-703/E-704 over the E-714.

Used the two holes on the forward face of the E-713 as a guide to drill the lead. Started with smaller drill sizes to the final size of #12....Need to use Boelube here.

Machine counter sunk the E-714 and dimpled the E-713.

The screw head sits nice and flush into the counterweight.
' style=

Counterweight drilled to #12

Counterweight drilled to #12

' style=

E-713 dimpled

E-713 dimpled

' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.